Ronald spent the day making a painting for his friend. At the end of the day, Ronald finished 1/4 of the painting. If he is able to finish as much of the painting each day he works, how long will it take him to make 2 whole paintings? terima kasih

1

Jawapan

2016-06-25T10:35:12+08:00
1/4 painting= 1 day
4/1 = 1 whole painting = 4 days
4/1 × 2 = 8 days